Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 3309

Re: Multiple level BoM with Dummy components and backflush via MFBF

$
0
0

Marco

 

ME will confirm any components back to ECC that are directly consumed on the current SFC (and not inside a subassembly of the SFC as would be done during manufacture of the subassembly in ME).

Only those components which are defined as not backflushed in ERP (i.e. the "Backflush in ERP" flag is NOT set in Material Maintenance) will be confirmed.  Bear in mind Evgeniy's point about the configuration of the collaboration also, with regard to sending onlyNonBackflushed or noneIfBackflushed.

 

Stuart


Viewing all articles
Browse latest Browse all 3309


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>